How Long Does a Kitchen Remodel Take?

A kitchen renovation is one of the most popular home improvement projects in the United States. Homeowners in Los Angeles and across the country often ask the same question before starting, how long will my kitchen renovation take? The answer depends on the type of project, the planning involved, and how smoothly each phase moves forward.

This guide breaks down the full kitchen renovation timeline in simple terms. You will learn what affects the duration, how long different types of remodels usually take, and what you can do to avoid delays. Whether you are planning a small update or a full kitchen remodel, this article will help you set realistic expectations.

Understanding the Kitchen Renovation Timeline

What Affects the Length of a Kitchen Remodel

Several factors influence how long a kitchen renovation takes. Every home and project is different, but common factors include the size of the kitchen, the scope of work, permit requirements, and material availability.

Other key influences include how quickly decisions are made, whether there are hidden issues behind walls, and how well the construction schedule is managed. Homes in Los Angeles, especially older ones, may also require additional inspections or code updates that affect timing.

Average Timeframe for a Kitchen Renovation

On average, a kitchen renovation can take anywhere from a few weeks to several months. Small updates may finish in under a month, while full remodels often take three to six months from planning to completion.

This timeline usually includes pre-construction planning, active construction, inspections, and final adjustments. Understanding this full process helps prevent frustration and surprises.

Kitchen Renovation Timeline by Project Type

Minor Kitchen Updates (1–4 Weeks)

Minor kitchen updates focus on surface-level improvements. These projects usually move quickly because they do not involve major structural or system changes.

Common examples include:

Since permits are often not required, these projects can start sooner and finish faster.

Mid-Range Kitchen Remodels (6–12 Weeks)

Mid-range remodels involve more work but keep the existing layout mostly intact. These projects often include replacing cabinets, countertops, flooring, and appliances.

Typical tasks include:

  • New cabinets and countertops
  • Updated flooring
  • Appliance replacements
  • Minor plumbing or electrical updates

Permits and inspections are usually required, which adds time. Most mid-range kitchen remodels take between six and twelve weeks once construction begins.

Full Kitchen Remodels (3–6 Months)

A full kitchen remodel is the most time-consuming option. These projects often include layout changes, wall removal, and full system upgrades.

Work may include:

  • Moving walls or doorways
  • Relocating plumbing and electrical lines
  • Installing custom cabinets
  • Upgrading ventilation systems

Full remodels require detailed planning, multiple permits, and several inspections. In many cases, the total timeline reaches three to six months or longer.

Pre-Construction Phase

Planning and Design:

The planning and design phase sets the foundation for the entire project. This stage includes defining goals, setting a budget, and finalizing the kitchen layout.

Homeowners work through design choices such as cabinet style, countertop materials, flooring, and appliance placement. Rushing this phase often leads to mistakes and delays later.

Contractor Selection and Scheduling:

Choosing the right contractor can significantly affect your timeline. Scheduling depends on contractor availability, especially during busy seasons.

Once a contractor is selected, the project is placed on the calendar. This step alone can take weeks depending on demand.

Permits and Approvals:

Many kitchen renovations require permits, especially when plumbing, electrical, or structural work is involved. Permit approval times vary by city and project scope.

In Los Angeles, permits are reviewed by the local building department. You can learn more about permit requirements through official city resources like the Los Angeles Department of Building and Safety website.

Ordering Materials and Lead Times:

Materials often take longer to arrive than expected. Cabinets, countertops, and specialty items may have long lead times, especially custom products.

Ordering materials early helps prevent construction delays once work begins.

Construction Phase Timeline

Demolition and Preparation:

Demolition usually begins the construction phase. Old cabinets, countertops, flooring, and appliances are removed.

This stage typically takes a few days to a week, depending on kitchen size and complexity.

Structural, Plumbing, and Electrical Work:

Once demolition is complete, rough construction begins. This includes framing changes, plumbing reroutes, and electrical updates.

This phase can take several weeks, especially if inspections are required before moving forward.

Inspections and Sign-Offs:

Inspections are scheduled at key points to ensure work meets building codes. Inspectors may review framing, electrical wiring, plumbing, and gas lines.

Delays can occur if corrections are required before approval is granted.

Cabinet, Countertop, and Flooring Installation:

After inspections, installation work begins. Cabinets are usually installed first, followed by countertops and flooring.

This stage often takes one to three weeks, depending on materials and kitchen size.

Appliances, Lighting, and Finishing Work:

The final construction steps include installing appliances, lighting fixtures, hardware, and trim. Painters and finish carpenters complete the remaining details.

Once finished, the kitchen begins to look complete and functional.

Post-Construction Phase

Final Walkthrough and Adjustments:

After construction is complete, the homeowner and contractor walk through the kitchen together. Any issues or unfinished items are noted.

This step ensures the work meets expectations before final approval.

Punch List and Project Completion:

The punch list includes small fixes like touch-up paint, cabinet adjustments, or hardware corrections. These tasks usually take a few days to complete.

Once finished, the project is officially complete and final payments are made.

Factors That Can Impact the Timeline

Project Scope and Complexity:

The larger and more complex the project, the longer it will take. Layout changes, custom work, and system upgrades all add time.

Permit Delays:

Permit reviews and inspections can slow progress, especially if revisions are required. Working with experienced professionals helps minimize these delays.

Material Availability:

Backordered or discontinued materials are a common cause of delays. Choosing readily available options helps keep the schedule on track.

Contractor Scheduling:

Subcontractor availability affects timelines. Plumbers, electricians, and installers must coordinate schedules to avoid gaps in progress.

Design Changes During Construction:

Mid-project changes almost always extend timelines. Even small changes can require new materials or revised plans.

Common Causes of Delays

Hidden Structural or Utility Issues:

Once walls or floors are opened, hidden problems may appear. Common issues include outdated wiring, plumbing leaks, or structural damage.

Addressing these problems is necessary but can add unexpected time.

Inspection or Approval Delays:

Missed inspections or failed approvals can pause work. Scheduling inspections early helps reduce downtime.

Budget or Material Changes:

Budget adjustments or material upgrades during construction can cause delays while new items are ordered or plans are revised.0

Tips to Keep Your Kitchen Remodel on Schedule

Plan Decisions Before Construction:

Make as many decisions as possible before work begins. This includes layout, materials, and finishes.

Clear decisions reduce delays and keep contractors moving forward.

Choose Readily Available Materials:

Stock cabinets, standard appliances, and common finishes usually arrive faster than custom items.

This choice can shave weeks off your timeline.

Maintain Clear Communication:

Regular communication with your contractor helps prevent misunderstandings. Ask questions, review schedules, and address concerns early.

Frequently Asked Questions (FAQs)

How long does a typical kitchen renovation take?

Most kitchen renovations take between six weeks and six months, depending on project size and complexity.

Can I use my kitchen during the remodel?

In many cases, the kitchen will be partially or fully unusable during construction. Setting up a temporary kitchen is recommended.

Do permits slow down the renovation?

Permits can add time upfront, but they help prevent bigger issues later. Proper planning reduces permit-related delays.

What phase takes the longest in a kitchen remodel?

The construction phase usually takes the longest, especially when structural or system work is involved.

How can I avoid delays?

Early planning, quick decision-making, material availability, and clear communication are the best ways to avoid delays.

Schedule Your Complimentary Consultation

Fill out the form so we can start planning your remodel. One of our friendly coordinators will be in touch to book your consultation.

Our estimates are complimentary and obligation-free.

This field is for validation purposes and should be left unchanged.
Name(Required)
Address(Required)
Consent box(Required)

Winter Savings:

Save Up to 75% OFF Installation

On Home Improvements!
Limited Time Only…

This field is hidden when viewing the form
This field is hidden when viewing the form
This field is hidden when viewing the form
Checkbox(Required)